General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing

Date                :           03 June 2019

To                    :           Laguna Tower Residents

Subject            :           General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing

Please be informed that on Thursday6 June 2019, Loxon – nominated FDAS contractor, will conduct a General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing schedule as follows:

ACTIVITYTIME
General Alarm Testing with Homing of Elevators10:00AM – 01:00PM
PA System Testing and Checking01:00PM – 05:00PM

During the activity in the morning, alarms will set off intermittently. Activation of the General Alarm and ringing of strobe horns will last from 10-15 seconds per floor.

There will be a 15 minutes elevators downtime from 10:00AM – 1:00PM while doing the testing.

In the afternoon work activity, random sound check will be heard and noticeable.

We apologize for the inconvenience that we might cause you.

Thank you and we hope for your usual cooperation on this matter.

For and on behalf of The Residences at Greenbelt Condominium Corporation

BUILDING ADMINISTRATION OFFICE

Leave a Reply