SCHEDULE – ANNUAL WINDOW CLEANING
Dear Unit Owners/Residents, As part of the maintenance and upkeep of the window façade, please be informed that Cradlecraft Access Asia Incorporated – our nominated contractor will do the window…
Dear Unit Owners/Residents, As part of the maintenance and upkeep of the window façade, please be informed that Cradlecraft Access Asia Incorporated – our nominated contractor will do the window…
A. FDAS TESTING FOR JUNE (9:00am to 6:00pm): SAN LORENZOJune 3,4,6-8 (Mon-Tues,Thurs-Sat) B. PEST CONTROL FOR JUNE (9:00am to 6:00pm): SAN LORENZOJune 3,4, 6-8 (Mon-Tues,Thurs-Sat)San Lorenzo Tower HallwaysJune 8 (Sat) C. MIST BLOWER…
Please be informed that on Monday, 3 June 2019, Loxon – nominated FDAS contractor, will conduct a General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing schedule as follows: ACTIVITYTIMEGeneral Alarm Testing with Homing of Elevators10:00AM – 1:00PMPA System Testing and Checking1:00PM – 5:00PM During the activity in the morning,…
Dear Unit Owners/Residents, As part of the maintenance and upkeep of the window façade, please be informed that Cradlecraft Access Asia Incorporated – our nominated contractor will do the window…
Please be informed that our contractor, Unifield, will be conducting a preventive maintenance of the pressure reducing valves (PRV), tomorrow May 30, 2019. During this activity, Basement 3 up to 25th floor will be affected and…
Dear Unit Owners/Residents, As part of the maintenance and upkeep of the window façade, please be informed that Cradlecraft Access Asia Incorporated – our nominated contractor will do the window…
Please be informed that our contractor, Unifield, will be conducting a preventive maintenance of the pressure reducing valves (PRV) located on the 35th floor, tomorrow May 28, 2019. During this activity, 26th up to 35th floor will be…
We thank you for your positive response in the offered services of Vaxpoint for the flu vaccine and since we received numerous queries related to the vaccines, Vaxpoint Preventive Healthcare…
Please be advised that there will be water supply interruptions from 10:00AM to 5:00PM on May 28, 2019. Engineering Office will replace a defective water supply gate valve serving 5th floor to basement…
We are pleased to inform everyone to we will be offering flu and pneumonia vaccines to all residents at a special rate. Date : 15 June 2019, Saturday Time : 09:00am –…