Circular No. 19-221 - LOAD TESTING OF GENERATOR SETS
Circular No. 19-221
Date : 16 December 2019
To : ALL RESIDENTS
Subject : LOAD TESTING OF GENERATOR SETS
Please be advised that our Engineering Team will conduct a load testing of generators on the following dates:
DATE |
ELEVATOR |
TIME OF POWER TRANSFER |
SOURCE |
December 18, 2019 (Wednesday) |
Laguna Tower |
Between 10:00 AM to 10:30 AM |
Transfer of Normal Power to Genset Power |
Between 3:30 PM to 4:00 PM |
Transfer of Genset Power to Normal Power |
||
San Lorenzo Tower |
Between 1:00 PM to 2:00 PM |
Transfer of Normal Power to Genset Power |
|
Between 4:00 PM to 5:00 PM |
Transfer of Genset Power to Normal Power |
||
December 19, 2019 (Thursday) |
Manila Tower |
Between 10:00 AM to 10:30 AM |
Transfer of Normal Power to Genset Power |
Between 3:30 PM to 4:00 PM |
Transfer of Genset Power to Normal Power |