Circular No. 19-221 – LOAD TESTING OF GENERATOR SETS

  • Version
  • Download 4
  • File Size 149.79 KB
  • File Count 1
  • Create Date December 19, 2019
  • Last Updated December 19, 2019

Circular No. 19-221 - LOAD TESTING OF GENERATOR SETS

Circular No. 19-221
Date             :         16 December 2019
To                :         ALL RESIDENTS

Subject         :           LOAD TESTING OF GENERATOR SETS

 
Please be advised that our Engineering Team will conduct a load testing of generators on the following dates:
 
DATE
ELEVATOR
TIME OF POWER TRANSFER
SOURCE
December 18, 2019 (Wednesday)
Laguna Tower
Between 10:00 AM to 10:30 AM
Transfer of Normal Power to Genset Power
Between 3:30 PM to 4:00 PM
Transfer of Genset Power to Normal Power
San Lorenzo Tower
Between 1:00 PM to 2:00 PM
Transfer of Normal Power to Genset Power
Between 4:00 PM to 5:00 PM
Transfer of Genset Power to Normal Power
December 19, 2019 (Thursday)
Manila Tower
Between 10:00 AM to 10:30 AM
Transfer of Normal Power to Genset Power
Between 3:30 PM to 4:00 PM
Transfer of Genset Power to Normal Power
 
During the load testing activity, please expect the following items:
·         All elevators will be shut down for five (5) minutes and will resume its normal operation once transfer of power has been made.
·         Residential units will experience power fluctuation for less than 15 to 20 secs. during the power transfer—indicated above.
 
Thank you for your usual cooperation.
 