Circular No.: 19-152 – RETROFITTING OF PRESSURE REDUCING VALVE (PRV) AT 25th FLOOR

  • Version
  • Download 3
  • File Size 157.88 KB
  • File Count 1
  • Create Date September 12, 2019
  • Last Updated September 12, 2019

Circular No.: 19-152 - RETROFITTING OF PRESSURE REDUCING VALVE (PRV) AT 25th FLOOR

Circular No.: 19-152

Date                :     11 September 2019

To                    :     18th to 25th Floor (B,C,D,E) Units Laguna Unit Owners/Residents

Subject            :     RETROFITTING OF PRESSURE REDUCING VALVE (PRV) AT 25th FLOOR

 

 

Please be advised that our in-house maintenance will do retrofitting works of the PRV at 25th floor on schedule below:

 

LOCATION OF RETROFITTING DATE TIME
25th Floor Laguna TowerGarbage Chute Area 13 September 2019 9:00 AM to 5:00 PM

 

Please note that there will be no water supply during the scheduled maintenance and repair works from 18th floor to 25th floor (B,C,D,E) units on the date above specified.  May we also request that you refrain from using any faucet, shower, toilet or bidet during this time and urge everyone to make the necessary preparations and make sure to have enough stock or supply of water in your kitchen and bathroom during the said activity.

 

Upon resumption of the water supply, your tap water will appear to be light brown in color.  We advise that you let the tap water to continuously flow until the discoloration disappears.

 

Thank you and we hope for your usual cooperation on this matter.

 

 

For and on behalf of THE RESIDENCES AT GREENBELT CONDOMINIUM CORPORATION,

 

 

BUILDING ADMINISTRATION OFFICE

Leave a Reply