Circular No.: 20-033 – LOAD TESTING FOR GENSET

  • Version
  • Download 6
  • File Size 97.61 KB
  • File Count 1
  • Create Date February 23, 2020
  • Last Updated February 23, 2020

Circular No.: 20-033 - LOAD TESTING FOR GENSET

Circular No.: 20-033
Date                :           19 February 2020
To                    :           LAGUNA TOWER UNIT OWNERS & RESIDENTS
Subject            :           LOAD TESTING FOR GENSET
Please be advised that Maintenance and Engineering Team will be conducting Load Testing of all three (3) generators on 22 February 2020 (Saturday), between 9:00am to 5:00pm.
During the load testing and maintenance, all elevators will be shut down for about fifteen (15) minutes and all residential units will experience power fluctuations in between the above-mentioned time because of the power transfer from normal supply to emergency supply.
We advise that preparation be made to ensure that power supply of your electronic appliances and refrigerators/freezers and other appliances are monitored to avoid damaged and spoilage of your stored foods and other perishable items.
Thank you for your usual understanding.
For and on behalf of The Residences at Greenbelt Condominium Corporation
BUILDING ADMINISTRATION OFFICE

Leave a Reply