-
Version
-
Download
4
-
File Size
99.90 KB
-
File Count
1
-
Create Date
January 14, 2020
-
Last Updated
January 14, 2020
Circular No.19-224 - Replacement of Granite Flooring Passenger Elevator 1
Circular No.19-224
Date : 20 December 2019
To : San Lorenzo Tower Unit Owners & Residents
Subject : Replacement of Granite Flooring Passenger Elevator 1
Dear Valued Unit Owners and Residents,
We would like to inform you that our Passenger Elevator 1 will undergo a replacement of granite flooring on December 21,2019 (Saturday) from 8:00 AM to 8:00 PM.
In line with this, our elevator will be temporarily shutdown during the said date and time. Rest assured that there will be a three (3) elevators operational.
Thank you and we hope for your usual cooperation.
For and on behalf of THE RESIDENCES AT GREENBELT CONDOMINIUM CORPORATION,
BUILDING ADMINISTRATION OFFICE