Circular No.19-224 – Replacement of Granite Flooring Passenger Elevator 1

  • Version
  • Download 4
  • File Size 99.90 KB
  • File Count 1
  • Create Date January 14, 2020
  • Last Updated January 14, 2020

Circular No.19-224 - Replacement of Granite Flooring Passenger Elevator 1

Circular No.19-224
Date         :    20 December 2019
To            :    San Lorenzo Tower Unit Owners & Residents
Subject     :    Replacement of Granite Flooring Passenger Elevator 1
Dear Valued Unit Owners and Residents,
We would like to inform you that our Passenger Elevator 1 will undergo a replacement of granite flooring on December 21,2019 (Saturday) from 8:00 AM to 8:00 PM.
In line with this, our elevator will be temporarily shutdown during the said date and time. Rest assured that there will be a three (3) elevators operational.
Thank you and we hope for your usual cooperation.
For and on behalf of THE RESIDENCES AT GREENBELT CONDOMINIUM CORPORATION,
BUILDING ADMINISTRATION OFFICE

Leave a Reply