To : 6th to 17th (B,C,D,E) Floor Laguna Unit Owners/Residents
Subject :CONTINUATION OF PRESSURE REDUCING VALVE (PRV) RETROFITTING AT 17th FLOOR
Please be advised that our in-house maintenance needs additional one (1) more day to continue the retrofitting works of the PRV at 17th floor on schedule below:
LOCATION OF RETROFITTING
DATE
TIME
17th Floor Laguna Tower
21 September 2019
9:00 AM to 1:00 PM
Please note that there will be water interruption during the scheduled maintenance and repair works from 6th floor to 17th floor (B,C,D,E) on the date above specified. May we also request that you refrain from using any faucet, shower, toilet or bidet during this time and urge everyone to make the necessary preparations and make sure to have enough stock or supply of water in your kitchen and bathroom during the said activity.
Upon resumption of the water supply, your tap water will appear to be light brown in color. We advise that you let the tap water to continuously flow until the discoloration disappears.
Thank you and we hope for your usual cooperation on this matter.