General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing

Date                :           03 June 2019 To                    :           Laguna Tower Residents Subject            :           General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing Please be informed that on Thursday, 6 June 2019, Loxon…

Continue Reading General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing

SCHEDULE OF FDAS & PEST CONTROL

A.    FDAS TESTING FOR JUNE (9:00am to 6:00pm): SAN LORENZOJune 3,4,6-8 (Mon-Tues,Thurs-Sat) B.    PEST CONTROL FOR JUNE (9:00am to 6:00pm): SAN LORENZOJune 3,4, 6-8 (Mon-Tues,Thurs-Sat)San Lorenzo Tower HallwaysJune 8 (Sat) C.     MIST BLOWER…

Continue Reading SCHEDULE OF FDAS & PEST CONTROL

Circular No.: 19-088 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION

Please be informed that our contractor, Unifield, will be conducting a preventive maintenance of the pressure reducing valves (PRV), tomorrow May 30, 2019. During this activity, Basement 3 up to 25th floor will be affected and…

Continue Reading Circular No.: 19-088 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION

Circular No.: 19-086 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION

Please be informed that our contractor, Unifield, will be conducting a preventive maintenance of the pressure reducing valves (PRV) located on the 35th floor, tomorrow May 28, 2019. During this activity, 26th up to 35th floor will be…

Continue Reading Circular No.: 19-086 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION