SCHEDULE OF FDAS & PEST CONTROL

A.    FDAS TESTING FOR JUNE (9:00am to 6:00pm): SAN LORENZOJune 3,4,6-8 (Mon-Tues,Thurs-Sat) B.    PEST CONTROL FOR JUNE (9:00am to 6:00pm): SAN LORENZOJune 3,4, 6-8 (Mon-Tues,Thurs-Sat)San Lorenzo Tower HallwaysJune 8 (Sat) C.     MIST BLOWER…

Continue Reading SCHEDULE OF FDAS & PEST CONTROL

General Alarm Testing with Homing of Elevators Public Address (PA) System Testing

Please be informed that on Monday, 3 June 2019, Loxon – nominated FDAS contractor, will conduct a General Alarm Testing with Homing of Elevators and Public Address (PA) System Testing schedule as follows: ACTIVITYTIMEGeneral Alarm Testing with Homing of Elevators10:00AM – 1:00PMPA System Testing and Checking1:00PM – 5:00PM During the activity in the morning,…

Continue Reading General Alarm Testing with Homing of Elevators Public Address (PA) System Testing

Circular No.: 19-088 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION

Please be informed that our contractor, Unifield, will be conducting a preventive maintenance of the pressure reducing valves (PRV), tomorrow May 30, 2019. During this activity, Basement 3 up to 25th floor will be affected and…

Continue Reading Circular No.: 19-088 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION

Circular No.: 19-086 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION

Please be informed that our contractor, Unifield, will be conducting a preventive maintenance of the pressure reducing valves (PRV) located on the 35th floor, tomorrow May 28, 2019. During this activity, 26th up to 35th floor will be…

Continue Reading Circular No.: 19-086 – PREVENTIVE MAINTENANCE OF PRESSURE REDUCING VALVES (PRV) AND POSSIBLE WATER INTERRUPTION